Dropped the Monaro down at The Panel Shop on October 21st 2019, and it wasn't long before the first photos started coming through. Quarters were stripped off and cleaned. Front end was removed, as were the diff, fuel tank and suspension. The bonnet (a NOS item i purchased years ago!) was sanded back, and the interior was cleaned of all sealer etc. Next, the car was going to head to the sand blaster...
Labour during this period:74 hours Clean & treat steel remove parts and sealer 24 hrs Remove fuel tank remove lead from seams drill spot welds 3.5 hrs Drill panels off and strip out to mount on rotisserie 36.5 hrs Remove proof coat paint and surface rust inside 1/4 panels 10 hrs